The 1st stage of your new driveway will be the arrival of our 18 ton
lorry and mini digger to start the excavation process
|
|
|
|
Our
18 ton lorry and mini digger ready to go |
|
The driveway is excavated to a depth of 300mm below the finished
driveway level. Then a 200mm layer of hardcore stone is added.
this is then compacted with a 1 ton roller ready to be sanded
|
| Our 3 Ton Mini Digger
|
|
|
Using the mini digger and shovels we add a 50 mm a layer of sharp sand
on top of the stone which is then compacted.
|
|
|
|
Our 3
Ton mini digger levelling & compacting the sand |
|
The sand is then "screeded" by hand to the slope of the drive
ready for the blocks to be laid.
|
| Our men screeding
the sand |
|
|
Then we fill any gaps in the drive using hand cut blocks and also fit
manhole covers and drains during this process
|
|
|
|
Our block layers laying blocks on the screeded
sand
|
|
The finishing touch sand being brushed into the gaps between
blocks
|
| Sand being brushed into the gaps |
|
|
|
|
|
|
|